The cabin was designed both internally and externally, taking into account numerous technical constraints. The goal was to enhance the crane operator’s working environment while keeping costs as low as possible.
One of the most challenging constraints was the requirement to use 2mm thick steel for the internal panels. As a result, all these panels are therefore produced from sheet metal and processed through bending and welding.